Project
Client
Location
Work Description
Delivery
Construction Period
Type of Contract & Work Responsibility
CALM Buoy Remedials and Commissioning
Bluewater
/Amerada Hess
Equatorial Guinea
Provision of vessels, dive team and project management to repair and fully commission CALM buoy
2002
17 days
Dayrate
SPM Changeout
Mobil
Nigeria
Replace old buoy with new
1998
3 weeks
Lump Sum
Oso RG Cable / Cable Tray Re-route
Mobil
Nigeria
Cable re-route
1998
2 months
Lump Sum
Bonny Warehouse Shelving
Mobil
Nigeria
Procure and install warehouse shelving system
1998
10 weeks
Lump Sum
Edop Pipeline Repair
Mobil
Nigeria
Repair and coating of 24" pipeline
1998
3 weeks
Dayrate
Marine Equipment Store
Mobil
Nigeria
Design, fabricate and install new structure to accommodate marine equipment
1998
2 months
Dayrate
West Area P&IDs
Mobil
Nigeria
Survey 20 platforms and produce accurate P&IDs and PFDs
1998
6 months
Day rate
Jet Fuel Tank Refurbishment
Mobil
Nigeria
Prepare engineering design and workscope
1998
4 weeks
Lump Sum
Ubit Conductor Modelling
Mobil
Nigeria
3D modelling of platform and conductor for installation design
1998
2 months
Dayrate
Akam Flare Bridge
Addax
Nigeria
Fabricate, install and hook-up replacement flare bridge
1998
14 weeks
Lump Sum
TMMP Topside Construction
Addax
Nigeria
Fabricate, install and hook-up pipework and structures
1998
3 weeks
Service Contract
Flowstation Revamp
Chevron
Nigeria
Remove all topside equipment, pipework and accommodation. Design, fabrication & installation of new equipment, pipework, instruments & electrics. Commission platform. Blast and paint
1997
6 months
Lump Sum
Platform Riser Survey (Subsea)
Mobil
Nigeria
Inspect all platform risers and prepare inspection reports
1997
12 months
Lump Sum
Asabo D Pipeline Repair
Mobil
Nigeria
Lift & remove damaged subsea line and riser. Fabricate replacement and re-install.
1997
3 weeks
Lump Sum
SPM 3 Mooring Chains
Mobil
Nigeria
Replacement and tensioning of SPM mooring chains
1997
3 weeks
Lump Sum
Flare System Upgrade Phase 1
Mobil
Nigeria
Process design, material procurement, Construction and commissioning of new flare system to give 100% capacity increase
1997
4 months
Lump Sum
Replacement Boatlanding
Mobil
Nigeria
Design, fabricate and install new boatlanding for BOP Platform
1996
3 weeks
Maintenance Contract
Platform Repair Programme
Mobil
Nigeria
Fabrication of all bracings, doubler plates, slip sleeves and associated steelwork required for subsea platform repairs
1996
4 months
Lump Sum
Ekpe Shutdown
Mobil
Nigeria
Overhaul and test all valves required for changeout during shutdown
1996
3 weeks
Maintenance Contract
E & I As-Built Programme
Mobil
Nigeria
Survey and sketch as-built detail for CAD input as required by MPN Engineering at QIT
1996
6 months
Maintenance Contract
Subsea Platform Repair Programme
Mobil
Nigeria
Design/Repair of 20 platform jackets using wet welding techniques
1996
5 months
Lump Sum
Oso PP Deck Extension
Mobil
Nigeria
Design, fabricate & install a cantilevered deck extension to accommodate process plant
1996
3 weeks
Maintenance Contract
Mfem A Revamp
Mobil
Nigeria
Install & commission navigation light system, test separator control panel & instrumentation. Clean/overhaul test separator
1996
1 month
Maintenance Contract
Unam A Revamp
Mobil
Nigeria
Install and commission new test/production manifolds & hook-up new flowlines to wellheads
1996
1 month
Maintenance Contract
E & I As-Built Programme
Mobil
Nigeria
Survey and sketch as-built detail for CAD input as required by MPN Engineering at QIT
1996
6 months
Maintenance Contract
Boatlanding Repair Programme
GUPCO
Egypt
Removal, repair and replacement of damaged platform boatlandings
1995
4 months
Lump Sum
Flowline Installation
Mobil
Nigeria
Survey and draught all flowlines for fabrication and installation
1995/96
2 years
Maintenance Contract
Ubit A
Mobil
Nigeria
Produce 3D CAD model for maintenance purposes
1995
2 months
Lump Sum
Ubit A Revamp
Mobil
Nigeria
Full revamp of platform instruments & overhaul shutdown valves, instrument gas scrubbers, sump system, metering system, pig launchers, test & production manifold separator level control system
1995
2 months
Maintenance Contract
Idoho / Ubit Tie-in
Mobil
Nigeria
Installation of 24" subsea valve
1994
1 month
Maintenance Contract
Field Maintenance Vessel / Service
Mobil
Nigeria
Provision of maintenance vessel and personnel for maintenance and construction support in Qua Iboe Terminal and offshore oil/gas fields
1983 to 1999
16 years
Service Contract
Diving Support Vessel / Service
Mobil
Nigeria
Provision of diving vessel and personnel for diving support services in offshore oil/gas fields at Qua Iboe
1981 to 1999
18 years
Service Contract