Chevron Flowstation Revamp, Nigeria
- |
The objective was the complete topside revamp of a three platform flowstation and associated onshore flare with minimum loss of production. |
- |
The $3.7m project covered procurement, materials control and all on site construction and installation. |
- |
The civil's work included the construction of a new flare line, pit, berm and tip. |
- |
The majority of the piping and instrumentation were replaced with new. |
- |
Electrical work included installation and hook-up of a new generator package. |
- |
New potable water pressure skids and storage tanks were installed. |
- |
New sump tank, stairways and access platforms were fabricated. |
|