MEGI FPSO Life Extension, Equatorial Guinea
- |
Mobil Equatorial Guinea Inc., the objective was the 'life extension' of a FPSO from 3 to 15 years. |
- |
Seaweld Engineering's involvement included:
- fabricating and installing pipework
- structural steelwork
- blasting and painting
- electrical/instrumentation work |
- |
MCV Offshore Base was moored alongside FPSO providing a base for Seaweld to work, accommodation for both Seaweld and other contractors, workshops, blast and painting facilities. |
- |
Dual pedestal cranes facilitated transfers from supply vessels to FPSO using the MCV deck as an interim, and much needed, storage and prefabrication area. |
|